Generator settings – SMA SI 3324 Installation User Manual
Page 136

Menu Structure and Parameter Lists
SMA
Technologie AG
Page 136
SI3324/4248-14:SE2406
Installation Guide
Generator Settings
23-13
TcycleFull
(B)
1 to 180 days
14
Number of days after which the next full
charge will occur (see also section 11.1
"Charge Control" (Page 102))
23-14
TcycleEqual
(B)
7 to 365 days
60
Number of days after which the next
equalization charge will occur (see also
section 11.1 "Charge Control"
(Page 102))
23-15
SOCLim1
(B)
0 to 100 %
40
Charge level at which the generator is
started (see section 11.3 "Deep Discharge
Protection/Battery State" (Page 105))
23-16
SOCLim2
(B)
0 to 100 %
30
Charge level at which load shedding will
occur (see section 11.3 "Deep Discharge
Protection/Battery State" (Page 105))
23-17
SOCLim3
(B)
0 to 100 %
20
Charge level at which the Sunny Island
3324/4248 switches off (see section 11.3
"Deep Discharge Protection/Battery
State" (Page 105))
23-18
TBatMax
(B)
0 to 55°C
45
Maximum battery temperature
No.
Name
Range/
unit
Default
Description
24-1
GenControl
(B)
Manual
Direct
GenMan
Manual
The generator start option to be used in
your system (see section 8.5.1 "Selection
of Generator Control Method"
(Page 75)).
Manual: Manual start or no generator
connected
Direct: Generator start using the Sunny
Island 3324/4248 "GenRequest" control
relay
GenMan: Generator start using the
(optional) GenMan
24-2
AmpacGenMax
(B)
2 to 56 AAC
10
Max. generator current that the Sunny
Island 3324/4248 will demand from the
generator (see section 8.5.2 "Setting the
Output Current Limit" (Page 77)).
Note: If the system load exceeds this
value, the Sunny Island 3324/4248 will
not switch to the generator, to avoid
overloading it. Ensure that a sensible
value is entered here!
No.
Name
Range/
unit
Default
Description