1
torque wrench with flathead screwdriver adapters:
size 10 mm
size 5.5 mm
size 2.5 mm
1 set
hexagon/Allen keys, 3 mm to 8 mm
cable ties
1
cable knife
cable lugs
1
combination pliers
1
Phillips screwdriver, PH1
1
Phillips screwdriver, PH2
cables (see sections 5.1 "Grounding" (S. 33); 5.2 "DC Connection" (S.
36), 5.3 "AC Connection" (S. 40))
1
10 mm open-end/ring wrenches or socket wrench
1
19 mm open-end/ring wrenches
1
24 mm open-end/ring wrenches
1
30 mm open-end/ring wrenches
1
crimping tool for the cable end sleeves (suitable for cable cross-
sections of 2.5 mm², 4 mm², 10 mm² to 50 mm²)
1
flathead screwdriver, 0.4 x 2.5 mm
1
flathead screwdriver, 1.0 x 10 mm
1
flathead screwdriver, 1.0 x 5.5 mm
heat shrink tubing
1
diagonal cutting pliers
Installation of the Sunny Boy or Windy Boy:
1
service cable, to allow settings to be made (see section 2.7 "SMA
Products (Optional)" (S. 17))
1
PC/laptop with the Sunny Data software (available as a free
download from
)
1
access permission: In order to set grid relevant parameters in the
Sunny Boy (see section 13.2 "Setting Sunny Boy Parameters" (S.
118)), you need a special access code, the installer code. You can
obtain this personal code from the Sunny Boy hotline (telephone: +49
561 9522 499).