Commissioning
SMA
Technologie AG
Page 68
SI3324/4248-14:SE2406
Installation Guide
19. Press
20. Press
21. The message "To start press
displayed.
The Sunny Island 3324/4248 can now be started and the loads supplied from
the batteries.
If however the system is to be operated with the public grid, a generator or a
PV system with Sunny Boys, then read section 8 on and make the following
additional parameter settings.
SMA Technologie AG also recommends the installation and use of a load
shedding system to protect the batteries (see section 8.6 "Automatic Load
Shedding Setting" (Page 80)).
During the "Init" initialization phase, the Sunny Island 3324/4248 performs a
number of self-tests to ensure that no faults exist in the system. Once these tests
are finished, the display normally shows the message "To init system press
fault must be corrected before continuing with first commissioning. Use the
information in section 18 "Troubleshooting/Problem Solving" (Page 143).
3324/4248, then wait 30 seconds before beginning the first commissioning
process anew.
To start
press