2 subprograms, Operating sequence, Programming notes – HEIDENHAIN TNC 320 (34055x-06) User Manual
Page 221: Programming a subprogram, Subprograms, Subprograms 7.2
Subprograms
7.2
7
TNC 320 | User's Manual HEIDENHAIN Conversational Programming | 5/2013
221
7.2
Subprograms
Operating sequence
1 The TNC executes the part program up to calling a subprogram,
CALL LBL.
2 The subprogram is then executed from beginning to end,
LBL 0.
3 The TNC then resumes the part program from the block after
the subprogram call
CALL LBL
Programming notes
A main program can contain up to 254 subprograms
You can call subprograms in any sequence and as often as
desired
A subprogram cannot call itself
Write subprograms at the end of the main program (behind the
block with M2 or M30)
If subprograms are located before the block with M2 or M30,
they will be executed at least once even if they are not called
Programming a subprogram
To mark the beginning, press the LBL SET key
Enter the subprogram number. If you want to use
a label name, press the LBL NAME soft key to
switch to text entry
To mark the end, press the LBL SET key and enter
the label number "0"