2 removing the blade – Artesyn ATCA 7370 / ATCA 7370-S Installation and Use (June 2014) User Manual
Page 60

Hardware Preparation and Installation
ATCA-7370/ATCA-7370-S Installation and Use (6806800P54F)
60
When the blade is completely installed, the blue LED starts to blink. This indicates
that the blade announces its presence to the shelf management controller.
6. Wait until the blue LED is switched off, then tighten the faceplate using the handles,
which secures the blade to the shelf.
The switched off blue LED indicates that the blade’s payload has been powered up
and that the blade is active.
7. Connect cables to the faceplate, if applicable.
2.5.2
Removing the Blade
This section describes how to remove the blade from an AdvancedTCA system.
If an RTM is connected to the front blade, make sure that the handles of both the RTM and
the front blade are closed in order to power up the blade’s payload.
Damage of Circuits
Electrostatic discharge and incorrect blade installation and removal can damage circuits or
shorten its life.
Before touching the blade or electronic components, make sure that you are working in an
ESD-safe environment.
Blade Malfunctioning
Incorrect blade installation and removal can result in blade malfunctioning.
When plugging the blade in or removing it, do not press on the faceplate but use the
handles.