Hardware preparation and installation, 1 unpacking and inspecting the blade, 2 environmental and power requirements – Artesyn ATCA 7370 / ATCA 7370-S Installation and Use (June 2014) User Manual
Page 45: Chapter, Chapter 2, hardware preparation and, Chapter 2

Chapter 2
ATCA-7370/ATCA-7370-S Installation and Use (6806800P54F)
45
Hardware Preparation and Installation
2.1
Unpacking and Inspecting the Blade
This section describes the procedure for packing and inspecting the blade.
Shipment Inspection
To inspect the shipment, perform the following steps.
1. Verify that you have received all items of your shipment:
Printed Quick Start Guide and Safety Notes Summary
ATCA-7370 blade
Any optional items ordered
2. Check for damage and report any damage or differences to the customer service.
3.
Remove the desiccant bag shipped together with the blade and dispose of it according to
your country’s legislation.
2.2
Environmental and Power Requirements
In order to meet the environmental requirements, the blade has to be tested in the system in
which it is to be installed.
Damage of Circuits
Electrostatic discharge and incorrect blade installation and removal can damage circuits or
shorten its life.
Before touching the blade or electronic components, make sure that you are working in an
ESD-safe environment.
The blade is thoroughly inspected before shipment. If any damage occurred during
transportation or any items are missing, please contact our customer service immediately.