EVCO EPK4BHQ1AH Installer manual User Manual
Page 39

EVCO S.p.A.
c-pro 3
NODE kilo AHU | Application manual ver. 1.0
page 39 of 114
PSd3
Password Installation Operator Level
(3)
0
-999
9999
-
IS
CONFIGURATION PARAMETERS
PG00
Unit type *
*see unit table
0
0
46
-
IS-C
PG01
Enable recovery device
NO (0)
NO (0)
YES (1)
-
IS-C
PG02
Ventilation steps
0
0
3
-
IS-C
PG03
Coil 1 type
0: Disabled
1: Water
2: Heating elements
3: Direct expansion
0
0
3
-
IS-C
PG04
Coil 1 mode
0: Disabled
1: Cooling
2: Heating
3: Cooling/Heating
0
0
3
-
IS-C
PG05
Coil 2 type
0: Disabled
1: Water
2: Heating elements
0
0
2
-
IS-C
PG06
Type of resistors
0: Disabled
1: 1 step DO
2: 2 step DO
3: modulating on AO
0
0
3
-
IS-C
PG07
Direct expansion steps
0: Disabled
1: 1 step DO
2: 2 step DO
0
0
2
-
IS-C
PG12
Enable dehumidification
NO (0)
NO (0)
YES (1)
-
IS-C
PG13
Manage heating heat exchanger
0: Disabled
1: at cross flow
2: with two coils
3: rotating On/Off (DO)
4: rotating Modulating (AO)
0
0
4
-
IS-C
PG14
Positioning sensor of control:
0: environment probe
1: probe in restart channel
Amb.
(0)
Amb.
(0)
Rest.
(1)
-
IS-C
HARDWARE AI PARAMETERS