beautypg.com

ADS Environmental Services ADS TRITON+ QR 775027 A3 User Manual

Page 419

background image

In-12

ADS TRITON+ Manual

SCADA

analog outputs, 8-8
connection, 8-8
Modbus, 9-1
Modbus output data registers, 9-11
setup, 6-74
verifying Modbus output data, 6-

74

wireless communication, 9-9

sensitivity, 6-22, 6-33, 6-38
sensor extension cables, 3-41
sensor temperature, 6-27, 6-48
sensors, 1-4

1/2-band mount

Peak Combo Sensor, 3-48

1/2-band mount with silt mount

adapter
Peak Combo Sensor, 3-48

3/4-band mount

Peak Combo Sensor, 3-44

3/4-band mount with silt mount

adapter
Peak Combo Sensor, 3-45

cleaning, 10-18
confirmation, 10-4
connecting to the monitor, 3-67
extension cables, 1-4
handling, 10-18
inspection, 10-18
installation, 3-7

ring assembly, 3-11, 3-23
standard mount, 3-53, 3-55
surcharge mount, 3-59

IS certification, 1-4
monitor ports, 2-7
mounting to the ring, 3-23
overview, 2-15

Peak Combo Sensor, 2-15
Surface Combo Sensor, 2-19
Ultrasonic Depth Sensor, 2-18

part numbers, B-1

Peak Combo Sensor

editing devices, 6-16
mounting to the ring, 3-25
mounting to the ring using the

silt mount adapter, 3-25

overview, 2-15
peak velocity, 2-17
pressure depth, 2-16
specifications, A-5
troubleshooting peak velocity,

10-50

troubleshooting pressure depth,

10-55

troubleshooting temperature,

10-56

troubleshooting upward

ultrasonic depth, 10-47

upward ultrasonic depth, 2-16

running diagnostics, 6-76
securing cables in the

pipe/manhole, 3-64

securing cables to the band, 3-51
securing cables to the ring, 3-27
securing dryer tube to the monitor,

3-69

special installation, 3-38

parts and supplies, 3-39
Peak Combo Sensor, 3-42
tools, 3-42

specifications

Peak Combo Sensor, A-5
Surface Combo Sensor, A-7
Ultrasonic Depth Sensor, A-9

standard installation, 3-7

mounting Peak Combo Sensor

to the ring, 3-25

mounting Peak Combo Sensor

to the ring using the silt
mount adapter, 3-25

mounting sensors to the ring,

3-23

mounting Surface Combo

Sensor to the ring, 3-32