beautypg.com

Activating the monitor – ADS Environmental Services ADS TRITON+ QR 775027 A3 User Manual

Page 259

background image

6-72 ADS TRITON+ Manual

Activating the Monitor

After configuring the monitor, activate the monitor to initiate the
flow monitoring process based on the monitor configuration.
Monitor activation involves generating the activation data using the
Qstart software, downloading this data to the monitor, and initiating
flow data measurement and logging. The activation data includes
relevant portions of the LIF and other configuration parameters
necessary to ensure monitoring activities reflect the specific site
conditions and project requirements. The monitor requires these
files and information to properly measure and record the flow.

Activate the monitor in the following way:

1. Select the monitor you want to activate from the Location

Name drop-down list in the Monitor section on the ADS
Qstart
dialog.

2. Verify that the configuration parameters and Connect type for

the monitor and monitoring point are correct and make
modifications, as necessary.

Note: For TRITON+ monitors equipped with SIMs with
dynamic IP addresses and using the FTP Operations
device, refer to page 6-9 for information on choosing the
correct Connect type.

Connect type of FTP selected

3. Click on the Activate button in the Functions section.