Gathering the tools and equipment, Mounting peak combo sensors – ADS Environmental Services ADS TRITON+ QR 775027 A3 User Manual
Page 103

3-42 ADS TRITON+ Manual
Gathering the Tools and Equipment
Gather the following tools for the installation:
Battery-powered hammer drill with assorted bits – including
the following at a minimum:
¼-inch (6-mm) x 6-inch (150-mm) masonry bit
3/8-inch (10-mm) x 4-inch (100-mm) [minimum length]
masonry bit
5/16-inch (8-mm) carbide-tipped bit
Heavy 4-pound (1.5-Kg) hammer
Rubber mallet
24-inch (610-mm) carpenter’s level
Nut driver set or socket set (English plus 13-mm for canister
hardware)
Wrenches (English plus 13-mm for canister hardware)
Screwdrivers (flathead and Phillips head of assorted sizes)
Threads tap compatible with the thread spec on the monitor
mounting stud
Diagonal wire cutters
Folding carpenter’s rule with a brass slide
Mastic tape (ADS p/n 507193) or rubber coaxial stretch tape
Mounting Peak Combo Sensors
Two special installation methods are available for mounting the
Peak Combo Sensor:
¾-band mount
½-band mount
Both mounts require almost identical installation methods. The
only significant differences are that the ¾-band mount allows the
installer to secure the band to both sides of the pipe wall and to