ADS Environmental Services ADS TRITON+ QR 775027 A3 User Manual
Page 417

In-10
ADS TRITON+ Manual
ports, 2-7
connecting a water quality sampler
to the monitor, 3-67
connecting sensors to the monitor,
3-67
power, 1-4
12-volt IS battery pack, 2-2, 2-10
battery pack, 1-4, 2-2
replacement, 10-10
checking battery pack voltage,
10-8
consumption, 5-3
diagnostic codes, 10-5
ExPAC, 1-4, 2-2, 2-11
external, 5-1
ExPAC, 5-19, 5-29
installation, 5-2
mounting the XBUS, 5-5
mounting the XIO, 5-5
power supply, 5-15, 5-19
requirements, 5-3
running the ground wires, 5-22,
5-29, 5-34
supplying to system, 5-36
XBUS, 5-29
XIO, 5-29
internal
12-volt IS battery pack, 2-10
battery voltage, 10-5
checking battery pack voltage,
10-8
replacing the battery pack,
10-10
regulator
replacement, 10-25
replacing fuses, 10-25
replacing the regulator, 10-25
running the ground wires, 5-22,
5-29, 5-34
supply to system, 5-36
wiring the AC power cable to the
power supply, 5-15
wiring the monitor to the ExPAC,
5-29
wiring the monitor to the XBUS,
5-29
wiring the monitor to the XIO,
5-29
wiring the power supply to the
ExPAC, 5-19
XBUS, 1-4, 2-2, 2-11
XIO, 1-4, 2-2, 2-11
power supply
installation, 5-7
mounting to DIN rail, 5-7
installation and wiring, 5-15, 5-19
specifications, A-12
wiring to the AC power cable,
5-15
wiring to the ExPAC, 5-19
pressure depth
editing sensor device parameters,
6-41
measurement, 2-16, 2-22
troubleshooting, 10-55
pressure depth sensor
replacing the desiccant in the dryer
tube, 10-20
replacing the dryer tube, 10-19
securing dryer tube to monitor,
3-69
processor board, 2-6
pump station, 3-5
Q
Qstart
analog device parameters, 6-64
assigning and editing devices,
6-12
collecting data, how to, 6-82
configuring a location, how to, 6-7
confirmations, 6-79
CSV decimal, 6-3
CSV file delimiters, 6-3
Dat path, 6-3
Data Delivery device parameters,
6-53