ADS Environmental Services ADS TRITON+ QR 775027 A3 User Manual
Page 336

Maintenance and Troubleshooting 10-15
Disconnecting the PCB from the battery pack
Set the PCB temporarily aside in a clean, dry location. Do
not discard! This PCB will be used with the replacement
battery pack.
10. Connect the PCB to the replacement battery pack and then
secure the PCB to the side of the pack with the red band.
11. Run the loose cable from the battery pack through the hole in
the underside of the retainer plug, and then seat the retainer
plug on top of the battery pack. Be sure to pull the excess
cable through the plug before fully seating the plug.
12. Lower the battery pack into the monitor canister, and then
connect the cable from the battery pack to the monitor
top/dome assembly.