beautypg.com

Configuring the monitor to support the ru-33, Connecting the monitor to the ru-33 – ADS Environmental Services ADS TRITON+ QR 775027 A3 User Manual

Page 406

background image

D-2

ADS TRITON+ Manual

intrinsically safe only when the Ru-33 is installed outside
the manhole.

Configuring the Monitor to Support the Ru-33

Configuring the TRITON+ to support the Telog Ru-33 requires
setting three parameters in Qstart when establishing a new location.
Refer to Create and Configure the Monitor Location in Chapter 6,
Configuration and Activation, for more information.

Scan frequency This represents the interval at which the

monitor takes readings. These readings are available for
retrieval directly from the monitor, but are overwritten with
new data at each new interval. Therefore, ADS recommends
using the same interval for both the scan rate in the monitor and
the rate at which the Telog unit requests the data from the
monitor.

Modbus ID This represents the Modbus slave ID that will be

used by the Ru-33 to indicate the specific monitor from which
to request the data. ADS recommends using 55 to identify the
TRITON+.

Modbus Delay Response This represents the amount of

time, in milliseconds, following the request before the monitor
will return the requested Modbus output data to the Ru-33.
ADS recommends maintaining the 10 ms default setting.

Connecting the Monitor to the Ru-33

Connecting the TRITON+ to the Ru-33 requires the ADS Triton-
Telog Comm Cable (ADS p/n 8000-0054-01). First, connect the
black, metal connector (with gray, plastic boot) from the comm
cable to the COMM + EXT PWR port on top of the TRITON+.