beautypg.com

Defining the minimum cycle time of the plc project – Lenze CANopen Controller-based Automation User Manual

Page 95

background image

13

Defining the minimum cycle time of the PLC project

13.1

Determining the task utilisation of the application

95

Lenze · Controller-based Automation · CANopen® Communication Manual · DMS 6.3 EN · 04/2014 · TD17

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

13

Defining the minimum cycle time of the PLC project

This chapter provides information on how to ...

Determining the task utilisation of the application

( 95)

Optimising the system

( 97)

13.1

Determining the task utilisation of the application

In the online mode, the Monitor tab of the Task Configuration shows current status details and

measurements of the cycles, cycle times, and jitters of the tasks contained.

The values are updated in the same time interval as that used for monitoring the values from the

controller.
If the cursor is on a task name field, the values displayed can be reset to 0 by the Reset context menu

command (right-click the task name field).