Planning the CANopen network

6.4

Special case: Delayed switch-on of one or more slaves

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

6.4

Special case: Delayed switch-on of one or more slaves

When the master is started, all slave devices must be switched on.
If this is not the case, a special procedure must be carried out for the following cases:

A. One or more slaves are switched on after the master starting process.

In this case, indicate each of these devices as "optional device" on the CANopen Remote Device

tab:

B. All slaves are switched on later.

In this case, additionally deactivate the "Polling of optional slaves" option on the CANopen

Manager tab:

After switching on the slaves, the Reset Communication command must be executed with the

"NMT" function block which is provided in the CiA library.