Initial operation – Leica Biosystems ASP6025 User Manual
Page 36

34
Instructions for Use V 2.2 RevI – 08/2013
4.
Initial Operation
Unpacking the instrument
(continued)
Removing the transport anchors
• After installing the monitor, you have to remove all transport
anchors (adhesive tape and foam parts).
• First, carefully remove all blue strips of adhesive tape (105)
that secure the doors and the drawer of the instrument.
105
Fig. 17
9
Fig. 18
• In the retort, you also have to remove the strip of adhesive
tape (105) that secures the cover of the level sensors
(
Fig. 19
).
• Then, open the drawer (9) and remove all foam parts there
(
Fig. 18
). Also remove the six dark gray molded parts (106)
from the necks of the RTU-bottles.
Fig. 19
106
19
19
105
9
• Remove the adhesive tape (105) from the lid of the retort
(19) (
Fig. 17
).
105
- SM2010 R (46 pages)
- CM305 S (66 pages)
- CE Knife holder (14 pages)
- CM1950 (78 pages)
- VT1200/VT1200 S (62 pages)
- VT1000 S (42 pages)
- HI1220 (18 pages)
- HI1210 (18 pages)
- CM1850 UV (56 pages)
- CM1850 UV (54 pages)
- CM1510-S (56 pages)
- CM3600 XP (114 pages)
- CM1100 (36 pages)
- CM1860/CM1860 UV (98 pages)
- Premium blade holder (14 pages)
- CM1520 (92 pages)
- VT1000 A (49 pages)
- VT1000 P (48 pages)
- SP2600 (51 pages)
- SM2500 (76 pages)
- SM2400 (8 pages)
- SM2000R (22 pages)
- EG1160 (32 pages)
- EG1150 C (20 pages)
- EG1150 H (42 pages)
- EG1130 (2 pages)
- EG1120 (2 pages)
- EG F (18 pages)
- ASP300 (70 pages)
- PELORIS_PELORIS II (160 pages)
- TP1020 (102 pages)
- ASP200 S (88 pages)
- ASP300 S (88 pages)
- LN22 (44 pages)
- RM CoolClamp (20 pages)
- RM2265 (88 pages)
- RM2255 (82 pages)
- RM2245 (78 pages)
- RM2235 (78 pages)
- RM2125 RTS (60 pages)
- SP9000 (30 pages)
- SP1600 (10 pages)
- ST4040 (50 pages)
- ST5020 (88 pages)