Here are the tools and material you need to provide to install the product:

Installing the chassis in an equipment rack requires the following items:

#2 Phillips-head screwdriver

Six equipment rack screws

Flat-head screwdriver

#2 Phillips-head 10 inch-lbs torque screwdriver (optional)

Installing the grounding wire requires the following items:

#2 Phillips-head screwdriver

Crimping tool

10 AWG stranded grounding wire

#2 Phillips-head 20 inch-lbs torque screwdriver (optional)

Installing the AT-SBxPWRSYS1 DC Power Supply requires the following
items:

Two 8 AWG power wires

One 10 AWG stranded grounding wire

8 mm wrench

#1 Phillips-head screwdriver

#3 Phillips-head screwdriver

#3 Phillips-head 30 to 40 inch-lbs torque screwdriver (optional)

Installing the AT-SBx31CFC960 Controller Fabric Card and Ethernet line
cards require the following items:

#2 Phillips-head screwdriver

#2 Phillips-head, 5 inch-lbs torque screwdriver (optional)