Allied Telesis AT-SBx31CFC960 User Manual
Page 112

Chapter 6: Installing the Power Supplies
112
Figure 56. Lowering the Handle on the AT-SBxPWRSYS1 AC Power
Supply
8. To install a second AT-SBxPWRSYS1 AC Power Supply, repeat this
procedure.
After installing the AT-SBxPWRSYS1 AC Power Supples, do one of the
following:
If you purchased the AT-SBxPWRPOE1 AC Power Supply for the
PoE+ ports on the AT-SBx31GP24 PoE Line Cards, go to
“Installing the AT-SBxPWRPOE1 AC Power Supply” on page 113.
Otherwise, go to Chapter 7, “Installing the AT-SBx31CFC960 Card
and Ethernet Line Cards” on page 125.
Note
Retain the tie wrap that comes with the power supply. You will use it
to secure the power cord to the chassis when you power on the unit
in “Powering On the AT-SBxPWRSYS1 AC Power Supply” on
page 173.