2 selection of detector, Bulletin f-9-pux2 – Dwyer PSX2 User Manual
Page 50
41
8.2
Selection of detector
(1) Selection of mounting methods
There are 2 methods for mounting the detector; V method and Z method. For the mounting
space, see the following sketch.
Length of frame of each sensor
Frame
Length of frame of each sensor
L
L
L: Mounting dimension
mounting dimension for
sensor displayed on the
SITE SETUP screen
D
D
Detector
L
V method
Detector
L
Z method
V method
Z method
Mounting method
Employ the Z method in the following cases.
• Mounting space need be saved (mounting space of the Z method is about one half of the V
method's).
• Turbid fl uid such as sewage is to be measured.
• Pipe has mortar lining.
• A thick fi lm of scale may have been formed on the inner surface of pipe because it is old.
• In sufi cient received signal-strength with mounting detectors in V method while using maxi-
mum transmission voltage.
Bulletin F-9-PUX2