beautypg.com

9 unload a test plan procedure, Unload a test plan procedure, Table 14.0 – Vanguard Tri-Phase User Manual

Page 99

background image

TRI-PHASE OPERATING™ INSTRUCTIONS

99


17.9 Unload a Test Plan Procedure

The following procedure allows the operator to clear a test plan from the FLASH EEPROM non-
volatile memory.

Table 14.0

Unload A Test Plan Procedure

STEP DESCRIPTION

DISPLAY

ACTION

1

Select “Test Plan” from the
“Main Menu”

1.RUN TEST

.

2.SETUP
3.TEST PLAN
4.DIAGNOSTIC
TIME: 20:15:00
DATE: 07/16/08

Press key number 3
Selection of 3 may be
made by turning the
Control Knob. Push
down Control Knob
after 3 is selected

2

Select “Unload Test Plan” from
the “Test Plan Menu”

1.LOAD TEST PLAN

.

2.UNLOAD TEST PLAN
3.PLAN DIRECTORY
4.PRINT TEST PLAN
5.ERASE TEST PLAN
6.SAVE TEST PLAN

Press key number 2
Selection of 2 may be
made by turning the
Control Knob. Push
down Control Knob
after 2 is selected

3

“Test Plan Unloaded” status
display

TEST PLAN UNLOADED!

Press any key or push
down Control Knob

4

Return to “Main Menu”

1.RUN TEST

.

2.SETUP
3.TEST PLAN
4.DIAGNOSTIC
TIME: 20:15:00
DATE: 07/16/08

Return to “Main
Menu”

NOTE:

After initial power-on of the TRI-PHASE™ or at any time that this

procedure is performed, the same result occurs.