9 unload a test plan procedure, Unload a test plan procedure, Table 14.0 – Vanguard Tri-Phase User Manual
Page 99
![background image](/manuals/354155/99/background.png)
TRI-PHASE OPERATING™ INSTRUCTIONS
99
17.9 Unload a Test Plan Procedure
The following procedure allows the operator to clear a test plan from the FLASH EEPROM non-
volatile memory.
Table 14.0
Unload A Test Plan Procedure
STEP DESCRIPTION
DISPLAY
ACTION
1
Select “Test Plan” from the
“Main Menu”
1.RUN TEST
.
2.SETUP
3.TEST PLAN
4.DIAGNOSTIC
TIME: 20:15:00
DATE: 07/16/08
Press key number 3
Selection of 3 may be
made by turning the
Control Knob. Push
down Control Knob
after 3 is selected
2
Select “Unload Test Plan” from
the “Test Plan Menu”
1.LOAD TEST PLAN
.
2.UNLOAD TEST PLAN
3.PLAN DIRECTORY
4.PRINT TEST PLAN
5.ERASE TEST PLAN
6.SAVE TEST PLAN
Press key number 2
Selection of 2 may be
made by turning the
Control Knob. Push
down Control Knob
after 2 is selected
3
“Test Plan Unloaded” status
display
TEST PLAN UNLOADED!
Press any key or push
down Control Knob
4
Return to “Main Menu”
1.RUN TEST
.
2.SETUP
3.TEST PLAN
4.DIAGNOSTIC
TIME: 20:15:00
DATE: 07/16/08
Return to “Main
Menu”
NOTE:
After initial power-on of the TRI-PHASE™ or at any time that this
procedure is performed, the same result occurs.