0 test plan options, Test plan options, Load a test plan and test a transformer procedure – Vanguard Tri-Phase User Manual
Page 89: Table 13.0

TRI-PHASE OPERATING™ INSTRUCTIONS
89
17.0 Test Plan Options
17.1 Load a Test Plan and Test a Transformer Procedure
.0 shows the procedure to test a single-phase transformer using a test plan for this example.
This procedure may be used for any transformer configuration. Each of the menus is described in
detail in the following paragraphs.
Table 13.0
Load a Test Plan and Test a Transformer Procedure
STEP DESCRIPTION
DISPLAY
ACTION
1
Load a test plan that is designed
to test a single phase transformer
Select “Test Plan” from the
“Main Menu”
1.RUN TEST
.
2.SETUP
3.TEST PLAN
4.DIAGNOSTIC
TIME: 20:15:00
DATE: 07/16/08
Press key number 3
Selection of 3 may be
made by turning the
Control Knob. Push
down Control Knob
after 3 is selected
2
Select “Load Test Plan” from
the “Test Plan Menu”
1.LOAD TEST PLAN
.
2.UNLOAD TEST PLAN
3.PLAN DIRECTORY
4.PRINT TEST PLAN
5.ERASE TEST PLAN
6.SAVE TEST PLAN
Press key number 1 or
push down Control
Knob
3
“Load Test Plan Status Display”
Enter test plan number
LOAD TEST PLAN
NUMBER:
Use keys 0 through 9
to enter test plan
number
4
“Load Test Plan Status Display”
Confirm test plan number
LOAD TEST PLAN
NUMBER: 1
Press “ENTER” key
or push down Control
Knob
(1 was entered)
5
Return to “Main Menu”
Perform test on transformer with
test plan
1.RUN TEST
.
2.SETUP
3.TEST PLAN
4.DIAGNOSTIC
TIME: 20:15:00
DATE: 07/16/08
Press key number 1 or
push down Control
Knob
6
“Test Plan Loaded Menu”
LCD displays test plan loaded in
temporary memory to be used to
test the transformer
Confirm to use test plan loaded
TP #1
Dyn1
TAPS: 1
TEST PLAN LOADED
1.CONTINUE
.
2.UNLOAD TEST PLAN
Press key number 1
or push down Control
Knob to continue
7
“Test Plan Loaded Status
Display”
LCD displays H and X voltages
for test 1
TAP NUMBER 1
H VTG: 12,000
X VTG: 208
“START” to RUN TEST
Press “START” key
to perform test