Vanguard Tri-Phase User Manual
Vanguard instruments co., inc
Table of contents
Document Outline
- 1.0 Introduction
- 1.1 Applicability
- 2.0 General Description
- 3.0 Functional Description
- 4.0 Principles of Operation
- 5.0 Specifications
- 6.0 Supplied Cables
- 7.0 TRI-PHASE™ Front Panel Descriptions
- 7.1 TRI-PHASE™ Operating Controls, Indicators and Connectors (continued)
- 8.0 TRI-PHASE™ Printer and Printer Paper
- 9.0 Memory Storage Capabilities
- 10.0 Operating Voltages
- 11.0 Special Features
- 12.0 Typical Cable Hook Up Configurations
- 12.2 Typical Cable Connections to a Delta-Wye Transformer (continued)
- 12.3 Single Phase Transformer Typical Connections
- 12.4 Voltage Regulator Typical Connections
- 12.5 Donut Type (un-mounted) Current Transformer (CT) Typical Connections
- 12.6 Multi-tap CT Typical Connections
- 12.7 Bushing-Mount-CT on A Typical Single Phase Transformer Connections
- 12.8 Bushing Mount CT’s on Typical Delta Transformer Connections
- 12.9 Bushing Mount CT’s on Typical Wye Transformer Connection
- 13.0 Single-Phase Transformer Test Procedure
- 13.0 Single-Phase Transformer Test Procedure (continued)
- 13.0 Single-Phase Transformer Test Procedure (continued)
- 13.1 Main Menu
- 13.2 Transformer Configuration Selection Menu
- 13.3 Transformer Name Plate Voltage Menu
- 13.4 Transformer Voltage Data Entry Status Displays
- 13.5 Start/Stop Test Status Display
- 13.6 Test In Progress Status Display
- 13.7 Test Results Status Display
- 13.8 Print Test Results Menu
- 13.9 Print Format Menu
- 13.10 Test Result Column Format Printout
- 13.11 Test Result Detail Format Printout
- 13.11 Test Result Detail Format Printout (continued)
- 14.0 Dyn1 Transformer Test Procedure
- 14.0 Dyn1 Transformer Test Procedure (continued)
- 14.0 Dyn1 Transformer Test Procedure (continued)
- 14.1 Delta-To-Wye (Dyn) Transformer Test Column Format Printout (continued)
- 14.2 Delta-To-Wye Transformer Test Detail Format Printout (continued)
- 14.2 Delta-To-Wye Transformer Test Detail Format Printout (continued)
- 14.2 Delta-To-Wye Transformer Test Detail Format Printout (continued)
- 15.0 Auto Detect Transformer Configuration Capability
- 16.0 Test Record Options
- 16.1 Restore A Test Record Procedure (continued)
- 16.2 Setup Menu
- 16.3 Save/Restore Record Menu
- 16.4 Restore Record Menu
- 16.5 Restore Record Number Status Display
- 16.6 Record Restored Menu
- 16.7 Print Record To LCD Or Printer Menu
- 16.8 Print Format Menu
- 16.9 Test Record Printout Column Format
- 16.10 Test Record Printout Detailed Format
- 16.11 Save Test Results To A Test Record Procedure
- 16.12 Print Test Record Directory
- 16.13 Print Directory Menu
- 16.14 Record Directory Printout
- 16.15 Restore Test Record To LCD Procedure
- 16.15 Restore Test Record To LCD Procedure (continued)
- 16.16 Scroll Test Record Menu
- 16.17 Restored Record Status Display
- 16.18 Record Restored Menu
- 16.19 Print Record Restored Menu
- 16.20 Restored Record Status Displays
- 16.21 Erase A Test Record Procedure
- 16.22 Erase Record Menu
- 16.23 Erase Record Status Display
- 16.24 Record Number Erased Confirmation Status Display
- 16.25 Erase All Test Records Procedure
- 16.26 Erase All Records Status Display
- 16.27 Record Number Erased Confirmation Status Display
- 17.0 Test Plan Options
- 17.1 Load a Test Plan and Test a Transformer Procedure (continued)
- 17.1 Load a Test Plan and Test a Transformer Procedure (continued)
- 17.2 Test Plan Menu
- 17.3 Load Test Plan Number Status Display
- 17.4 Test Plan Loaded Menu
- 17.5 Test Plan Loaded Status Display
- 17.6 Test Plan Test Results Status Display
- 17.7 Print Test Plan Test Results
- 17.8 Test Plan Test Results Printout
- 17.9 Unload a Test Plan Procedure
- 17.10 Print Test Plan Directory Procedure
- 17.11 Test Plan Directory Print Out
- 17.12 Print Test Plan Procedure
- 17.13 Print Test Plan Status Display
- 17.14 Typical Three Phase Dyn1 Test Plan Printout
- 17.15 Erase A Test Plan Procedure
- 17.16 Erase Test Plan Menu
- 17.17 Erase Test Plan Status Display
- 17.18 Test Plan Number Erased Confirmation Status Display
- 18.0 Entering Test Record Identification Information Procedure
- 19.0 Test Voltage Selection Procedure
- 20.0 Test Frequency Selection Procedure
- 21.0 Change Date And Time Procedure
- 22.0 H And X Cable Diagnostic Test Procedure
- 23.0 TRI-PHASE( Verification Test Procedure
- 24.0 Load Tap Changer
- 25.0 USB FLASH Thumb Drive
- 25.1 Save/Restore Record With Thumb Drive Menu
- 25.2 Copy Record To Thumb Drive Menu
- 25.3 Copy Single Record To Thumb Drive Status Displays
- 25.4 Copy All Records To Thumb Drive Status Displays
- 25.5 Test Plan With Thumb Drive Menu
- 25.6 Copy Test Plan To Thumb Drive Status Display
- 25.7 Test Plan Saved To Thumb Drive Confirmation Status Displays
- 25.8 Load Test Plan With Thumb Drive Menu
- 25.9 Load Thumb Drive Test Plan Status Displays
- 25.10 Print Test Plan Directory With Thumb Drive Menu
- 25.11 Print Test Plan With Thumb Drive Menu
- 25.12 Print Thumb Drive Test Plan Status Displays
- 25.13 Erase Test Plan With Thumb Drive Menu
- 25.14 Erase Thumb Drive Test Plan Status Displays
- 25.15 Save Test Plan With Thumb Drive Menu
- 26.0 Computer Interface Description
- 27.0 TRI-PHASE™ Firmware Programming Notes
- 27.0 TRI-PHASE™ Firmware Programming Notes (continued)
- 27.0 TRI-PHASE™ Firmware Programming Notes (continued)