beautypg.com

Connections for gen2 multi-lead probe, Connection procedure, Components – Teledyne LeCroy Summit T3-8 PCIe Multi-lane Protocol Analyzer User Manual User Manual

Page 32

background image

Teledyne LeCroy

Using Probes

20

Summit T3‐8 PCI Express Multi‐Lane Protocol Analyzer User Manual

Figure 3.18: Midbus Probe SSMP Cables

1 Clock Cable (

see Figure 3.15 on page 18

).

Connections for Gen2 Multi-lead Probe

Overview

Use a 1‐pod setup.

For x1 or x4, use the iPass Y‐cable to connect the probe data connectors on the Analyzer 
to the pod(s). 

On the other side of the pod, connect the flexible lead tips.

Connection Procedure

To connect Summit T3‐8 to the System Under Test (host platform or root complex under 
test): 

1. Connect the pods to the Analyzer using the iPass Y‐cable cables.
2. Connect the flexible lead tips to the pods using the SSMP cables.
3. Connect the lead tips to the system under test by soldering to the trace. 

3.9.3

Example: Connecting the Summit T3-8 Analyzer to the Device Under Test
Using a Gen2 Multi-lead Probe for x8

Components

2 iPass Straight cables for x8

Figure 3.19: iPass Straight Cables