Average task duration

The average task duration including preliminary and concluding steps is
indicated at the beginning of each procedure next to the procedure class.

Refer to

table 1 on page 26

for an overview of steps taken into account for

calculating the average task duration:

Average task duration: 10 minutes

Step

included

Explanation

Server shutdown

no

Shutdown time depends on hardware and
software configuration and may vary
significantly.

Disassembly

yes

making the server available

Transport

no

Transporting the server to the service table
(where required) depends on local
customer conditions.

Maintenance
procedures

yes

maintenance procedures including
preliminary and concluding software tasks

Transport

no

Returning the server to its installation site
(where required) depends on local
customer conditions.

Assembly

yes

reassembling the server

Starting up

no

Booting time depends on hardware and
software configuration and may vary
significantly.

Table 1: Calculation of the average task duration