beautypg.com

2 preliminary steps, Preliminary steps – FUJITSU PRIMERGY MX130 S2 User Manual

Page 214

background image

214

Upgrade and Maintenance Manual

MX130

S2

System board and components

Replacing the system board:

– Phillips PH2 / (+) No. 2 screw driver

Replacing the system board:

– Magnifying glass (for inspecting socket cover springs)

If a TPM module is installed:

– Bit screw driver
– TPM bit insert*
– thin slotted screw driver (

2 x 0.4 mm)*

*For the Japanese market:

– Dedicated TPM screw driver (CWZ8291A)
– TPM module fixing tool (S26361-F3552-L909)

12.3.2 Preliminary steps

Before replacing the system board, perform the following steps:

Ê

Disable BitLocker functionality as described in section

"Disabling BitLocker

functionality" on page 59

.

Ê

Shut down the server as described in section

"Shutting down the server" on

page 48

.

Ê

Disconnect all external cables.

Ê

Bring the server to its horizontal position.

Ê

Remove the server cover as described in section

"Removing the server

cover" on page 51

.

Ê

Fold open the front cage.