beautypg.com

Zilog EZ80F916 User Manual

Page 63

background image

UM014423-0607

Using the Integrated Development Environment

ZiLOG Developer Studio II

eZ80Acclaim!

®

User Manual

43

Figure 37. New Project Wizard Dialog Box—Target Memory Configuration Step

17. Enter the memory ranges appropriate for the target CPU and select the link

configuration from the Link Configurations drop-down list box.

18. Select the configuration that best fits your target. The project settings are modified

accordingly. ZDS II automatically generates a linker command file using the project
settings. Refer to “Link Configuration” on page 77 for details about available link
configurations.

19. Click Finish.

Open Project
To open an existing project, use the following procedure:

1. Select Open Project from the File menu.

The Open Project dialog box is displayed.

This manual is related to the following products: