beautypg.com

Zilog EZ80F916 User Manual

Page 62

background image

UM014423-0607

Using the Integrated Development Environment

ZiLOG Developer Studio II

eZ80Acclaim!

®

User Manual

42

Figure 36. New Project Wizard Dialog Box—Target and Debug Tool Selection Step

12. Select the Use Page Erase Before Flashing check box to configure the internal Flash

memory of the target hardware to be page-erased. If this check box is not selected, the
internal Flash is configured to be mass-erased.

13. Select the appropriate target from the Target list box.

14. Click Setup in the Target area.

Refer to “Setup” on page 96 for details on configuring a target.

NOTE: Click Add to create a new target (see “Add” on page 100) or click Copy to copy an

existing target (see “Copy” on page 101).

15. Select the appropriate debug tool and (if you have not selected the Simulator) click

Setup in the Debug Tool area.

Refer to “Debug Tool” on page 102 for details about the available debug tools and
how to configure them.

16. Click Next.

The Target Memory Configuration step of the New Project Wizard dialog box is
displayed.

This manual is related to the following products: