beautypg.com

Chapter 1: safety precautions, 1 warnings & cautions, Chapter 1 – AERCO Esteem Boiler with EZ-Set Controller User Manual

Page 9: Safety precautions

background image

GF-135

Esteem 399 Low NOx Boiler

Chapter 1

OMM-0089_0A

Installation, Operation & Maintenance Manual

Safety Precautions

CHAPTER 1: SAFETY PRECAUTIONS

1.1 WARNINGS & CAUTIONS

The following general warnings and cautions must be given the same attention as specific

precautions included in these instructions. In addition to the requirements included in this

Manual, the installation MUST conform with local building codes, or, in the absence of local

codes, ANSI Z223.1 (National Fuel Gas Code Publication No. NFPA-54). Where ASME CSD-1

is required by local jurisdiction, the installation must conform to CSD-1.
Where applicable, the equipment must be installed in accordance with the current Installation

Code for Gas Burning Appliances and Equipment, CGA B149, and applicable Provincial

regulations for the class. Authorities having jurisdiction should be consulted before installations

are made.
See the last two pages of this chapter for important information regarding installation of units

within the Commonwealth of Massachusetts.

IMPORTANT!

This Instruction Manual is an integral part of the product and

must be maintained in legible condition. It must be given to the

user by the installer and kept in a safe place for future

reference.

Installation and service must be performed by a qualified

installer, service agency or the gas supplier.

WARNING!

Do not use matches, candles, flames, or other sources of

ignition to check for gas leaks.

Prior to installing this product read all instructions included in

this manual and all accompanying manuals/documents. Perform

all installation steps required in these manuals in the proper

order given. Failure to adhere to the guidelines within these

manuals can result in severe personal injury, death or

substantial property damage.

Fluids under pressure may cause injury to personnel or damage

to equipment when released. Be sure to shut off all incoming

and outgoing water shutoff valves. Carefully decrease all

trapped pressures to zero before performing maintenance.

Before attempting to perform any maintenance on the unit, shut

off all gas and electrical inputs to the unit.

The exhaust vent pipe of the unit operates under a positive

pressure and therefore must be completely sealed to prevent

leakage of combustion products into living spaces.

High electrical voltages are used in this equipment, therefore

the cover on the unit’s power box must be installed at all times,

except during maintenance and servicing.

Page 9 of 188

AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913

OMM-0089_0A

MC1 06/19/14

Ph.: 800-526-0288