beautypg.com

AERCO Esteem Boiler with EZ-Set Controller User Manual

Page 3

background image


GF-135

Esteem 399 Low NOx Boiler

OMM-0089_0A

Installation, Operation & Maintenance Manual

TABLE OF CONTENTS

CHAPTER 1:

SAFETY PRECAUTIONS .............................................................................................. 9

1.1 WARNINGS & CAUTIONS ..................................................................................................................................... 9

1.2 EMERGENCY SHUTDOWN .................................................................................................................................. 10

1.3 PROLONGED SHUTDOWN .................................................................................................................................. 11

CHAPTER 2:

INSTALLATION .......................................................................................................... 15

2.1 CODE COMPLIANCE ........................................................................................................................................... 15

2.2 DETERMINING PRODUCT LOCATION ................................................................................................................. 15

2.3 BOILER REPLACEMENT ....................................................................................................................................... 16

2.4 RECOMMENDED CLEARANCES .......................................................................................................................... 16

2.5 RESIDENTIAL GARAGE INSTALLATIONS .............................................................................................................. 17

2.6 BOILER FREEZE PROTECTION FEATURE.............................................................................................................. 17

CHAPTER 3:

COMBUSTION AIR AND VENTING ............................................................................ 19

3.1 COMBUSTION AIR CONTAMINATION ................................................................................................................ 19

3.2 POTENTIAL CONTAMINATING PRODUCTS ......................................................................................................... 19

3.2.1 Areas Likely to Contain Contaminating Products ....................................................................................... 20

3.3 VENTILATION AND COMBUSTION AIR REQUIREMENTS - DIRECT VENT ............................................................ 20

3.4 VENTILATION AND COMBUSTION AIR REQUIREMENTS - CATEGORY IV ........................................................... 21

3.5 METHODS OF SUPPLYING COMBUSTION AIR TO A CONFINED SPACE - CATEGORY IV ...................................... 21

3.5.1 INDOOR COMBUSTION AIR......................................................................................................................... 22

3.5.2 OUTDOOR COMBUSTION AIR ..................................................................................................................... 23

3.5.2.1 Option 1: One Permanent Opening to Outside ................................................................................... 23

3.5.2.2 Option 2: Two Permanent Openings to Outside.................................................................................. 24

3.6 COMBINATION OF INDOOR AND OUTDOOR COMBUSTION AIR ....................................................................... 25

3.6.1 Outdoor Opening(s) Location ..................................................................................................................... 25

3.6.2 Outdoor Opening(s) Size ............................................................................................................................. 25

3.7 COMBUSTION AIR AND VENT PIPING ................................................................................................................ 25

3.8 REMOVAL OF AN EXISTING BOILER FROM A COMMON VENT SYSTEM .............................................................. 26

CHAPTER 4:

UNIT PREPARATION.................................................................................................. 29

4.1 HANDLING INSTRUCTIONS................................................................................................................................. 29

4.2 WALL MOUNTING INSTALLATION...................................................................................................................... 29

4.3 WALL MOUNTING GUIDELINES.......................................................................................................................... 29

4.4 STUD WALL INSTALLATION ................................................................................................................................ 30

4.5 BOILER MOUNTING............................................................................................................................................ 30

CHAPTER 5:

BOILER PIPING .......................................................................................................... 31

5.1 GENERAL PIPING REQUIREMENTS ..................................................................................................................... 31

5.2 PRESSURE RELIEF VALVE .................................................................................................................................... 31

5.3 BOILER AIR VENT................................................................................................................................................ 32

5.4 LOW WATER CUTOFF DEVICE ............................................................................................................................ 32

5.5 ADDITIONAL LIMIT CONTROL ............................................................................................................................ 33

5.6 BACKFLOW PREVENTER ..................................................................................................................................... 33

5.7 BOILER SYSTEM PIPING APPLICATIONS ............................................................................................................. 33

5.8 EXPANSION TANK AND MAKEUP WATER .......................................................................................................... 33

5.8.1 Diaphragm Expansion Tank ........................................................................................................................ 34

5.8.2 Closed-Type Expansion Tank ...................................................................................................................... 34

5.9 CIRCULATOR ...................................................................................................................................................... 34

5.10 SIZING PRIMARY PIPING .................................................................................................................................. 34

5.11 DOMESTIC HOT WATER SYSTEM PIPING ........................................................................................................ 34

Page 3 of 188

AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913

OMM-0089_0A

MC1 06/19/14

Ph.: 800-526-0288