beautypg.com

3 prolonged shutdown – AERCO Esteem Boiler with EZ-Set Controller User Manual

Page 11

background image

GF-135

Esteem 399 Low NOx Boiler

Chapter 1

OMM-0089_0A

Installation, Operation & Maintenance Manual

Safety Precautions

If overheating occurs or the gas supply fails to shut off, close the manual gas shutoff valve

(Figure 1-1) located external to the unit.

Figure 1-1: Typical Manual Gas Shutoff Valve

1.3 PROLONGED SHUTDOWN

After prolonged shutdown, it is recommended that the startup procedures and the safety device

test procedures in Chapter 12 of this manual be performed, to verify all system-operating

parameters.
If there is an emergency, turn off the electrical power supply to the AERCO boiler and close the

manual gas valve located upstream from the unit.
The installer must identify the emergency shut-off device to those responsible for operation of

the boiler.

NOTE

The Installer must identify and indicate the

location of the emergency shutdown

manual gas valve to operating personnel.

Page 11 of 188

AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913

OMM-0089_0A

MC1 06/19/14

Ph.: 800-526-0288