beautypg.com

Startup record for esteem 399 boiler - (continued), Venting, Combustion air – AERCO Esteem Boiler with EZ-Set Controller User Manual

Page 188: Boiler installation, Combustion settings, Co: _______________ppm

background image

GF-135 Esteem 399 Low NOx Boiler

OMM-0089_0A

Installation, Operation & Maintenance Manual

STARTUP RECORD FOR

ESTEEM 399 BOILER - (Continued)

Venting

How many elbows are in the ducting? ____

Is the vent sealed with RTV?

Yes

No

Is the vent pitched back toward the boiler (1/4" per ft. length) per the AERCO Venting Guide?

Yes

No

Venting material used is:

AL29-4C

Other (please specify):

Venting manufacturer is:

Please describe venting configuration (check all that apply):*

Individual Vent

Sidewall Termination Roof Termination

Breeched/Common (Units Vented Together)

Combustion Air

Combustion air supplied through (check all that apply):

Louvers to outside wall vent

Horizontal ducting

Direct or Sealed Combustion

Louvers to another room

Vertical ducting

Combustion air fan

If using sealed combustion, what is the size of the ducting to the unit?

If using sealed combustion, is an AERCO Air Inlet Adapter installed?

Yes

No

If combustion air is ducted, are there two (2) ducts—one high and one low?

Yes

No

Boiler Installation

Are balancing valves or circuit setters installed?

Yes

No

Has the water flow been balanced between the units?

Yes

No

What is the maximum flow rate through the unit?

GPM

Is the unit interlock utilized?

Yes

No

If yes, is it interlocked to:

Flow switch

Energy Management System

Damper end

switch

Other

Is the

system:

Water Source Heat

Pump

Primary/Secondary

Pumping

Used for Reheat

A Variable Flow

System

Other

Combustion Settings

CO

2

: _______________% Measured Rate of Input: _________________ Btu/hr

O

2:

_______________%

CO: _______________ppm

Page 188 of 188

AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913

OMM-0089_0A

MC1 06/19/14

Ph.: 800-526-0288