beautypg.com

13 ch post pump time (default: 1 minute) – AERCO Esteem Boiler with EZ-Set Controller User Manual

Page 127

background image

GF-135 Esteem 399 Low NOx Boiler

Chapter 18

OMM-0089_0A

Installation, Operation & Maintenance Manual Controller Operation

18.3.13 CH Post Pump Time (Default: 1 Minute)

Figure 18-17: CH POST PUMP TIME Menu

CH Post Pump Time sets how long the central heating circulators will continue to operate at the

completion of a heating call. Reference System Pump in CH Settings in section 18.3 to

determine which circulators will continue to operate. Any call during the CH Post Pump Time will

be ignored until the post pump has completed. The CH Post Pump feature allows the heat

remaining in the boiler at the completion of a call to be sent to the heating system, which will

improve the overall efficiency of the system. Press the LEFT or RIGHT buttons to adjust the CH

Post Pump Time then press the OK button to store the setting.
=======================================================================



















Page 127 of 188

AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913

OMM-0089_0A

MC1 06/19/14

Ph.: 800-526-0288