beautypg.com

AERCO Esteem Boiler with EZ-Set Controller User Manual

Page 5

background image


GF-135

Esteem 399 Low NOx Boiler

OMM-0089_0A

Installation, Operation & Maintenance Manual

10.7.3 CH2 Setpoint (Default: 140°F [60°C]) ........................................................................................................ 72

10.7.4 Select CH1 Reset Curve (Default: Finned Tube Baseboard) ...................................................................... 72

10.7.5 Select CH2 Reset Curve (Default: Low Mass Radiant) .............................................................................. 72

10.7.6 Set Warm Weather Shutdown Temperature (Default: OFF) .................................................................... 73

10.8 DOMESTIC HOT WATER EZ SETUP

....................................................................................................... 74

10.8.1 Select DHW Demand (Default: Switch) ..................................................................................................... 74

10.8.2 Boiler DHW Setpoint (Default: 186°F [86°C])............................................................................................ 74

10.8.3 DHW Storage Setpoint (Default: 140°F [60°C]) ......................................................................................... 75

10.8.4 DHW Priority Timeout (Default: Off) ........................................................................................................ 75

10.9 EZ SETUP RESET

.................................................................................................................................... 76

10.10 DISPLAY EZ SETUP

............................................................................................................................. 76

10.11 CH/DHW OPERATION

........................................................................................................................ 77

10.12 BOILER INFORMATION ............................................................................................................................. 77

10.12.1 Boiler Information Logging ..................................................................................................................... 79

10.13 LOCKOUT HISTORY......................................................................................................................................... 80

10.13.1 Lockout Details ....................................................................................................................................... 80

CHAPTER 11:

START-UP PREPARATION ...................................................................................... 85

11.1 CHECK BOILER SYSTEM WATER CHEMISTRY .................................................................................................... 85

11.1.1 Water pH Level 6.0 to 8.0 ......................................................................................................................... 85

11.1.2 Water Hardness Less Than 7 Grains ......................................................................................................... 85

11.1.3 Chlorinated Water .................................................................................................................................... 85

11.1.4 Flush Boiler to Remove Sediment ............................................................................................................. 85

11.1.5 Check and Test Antifreeze ........................................................................................................................ 86

11.1.6 Use of Antifreeze in the Boiler System ..................................................................................................... 86

11.2 BOILER CLEANING ............................................................................................................................................ 86

11.2.1 Cleaning an Old Boiler and System ........................................................................................................... 86

11.2.2 Cleaning of New Boiler/System: ............................................................................................................... 87

11.2.3 Filling the Boiler System ........................................................................................................................... 87

11.3 CHECK LOW WATER CUT-OFF DEVICE ............................................................................................................. 87

11.4 CHECK FOR GAS LEAKS ..................................................................................................................................... 88

11.5 CHECK THERMOSTAT CIRCUIT ......................................................................................................................... 88

11.6 INSPECTION OF CONDENSATE DRAIN ASSEMBLY ............................................................................................ 89

CHAPTER 12:

START-UP PROCEDURES ....................................................................................... 91

12.1 FINAL CHECKS BEFORE START-UP .................................................................................................................... 91

12.2 ESTEEM START-UP ........................................................................................................................................... 91

12.3 OPERATING INSTRUCTIONS (READ BEFORE OPERATING BOILER) .................................................................. 91

12.3.1 Troubleshooting Start-Up Problems ......................................................................................................... 93

12.4 INSPECTION OF THE ESTEEM BOILER AND SYSTEM......................................................................................... 93

12.4.1 Boiler Piping inspection ............................................................................................................................ 93

12.4.2 Vent Piping and Combustion Air Piping inspection .................................................................................. 93

Page 5 of 188

AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913

OMM-0089_0A

MC1 06/19/14

Ph.: 800-526-0288