beautypg.com

Chapter 4: unit preparation, 1 handling instructions, 2 wall mounting installation – AERCO Esteem Boiler with EZ-Set Controller User Manual

Page 29: 3 wall mounting guidelines, Chapter 4, Unit preparation

background image

GF-135

Esteem 399 Low NOx Boiler

Chapter 4

OMM-0089_0A

Installation, Operation & Maintenance Manual

Unit Preparation

CHAPTER 4: UNIT PREPARATION

4.1 HANDLING INSTRUCTIONS

The Esteem 399 Low NOx boiler is generally easier to handle and maneuver once removed

from the shipping carton. To remove the shipping carton, follow these instructions:

Removing the Esteem Boiler from the Shipping Carton

CAUTION!

Use care not to lift the unit from, or place the unit on the front

plastic control panel, damage can occur. Use care not to drop,

bump or rotate the boiler upside down, as damage to the boiler

will result.

1. Remove any shipping straps and open the side of the shipping carton.
2. Slide the unit with the foam inserts out of the carton.
3. Discard all packing materials.

4.2 WALL MOUNTING INSTALLATION

The Esteem boiler should be wall mounted using the bracket provided with the boiler. The

Esteem boiler is not designed for floor installation. If floor installation is required an optional floor

stand is available through AERCO International.

WARNING!

The wall used for mounting the Esteem 399 unit must be vertically

plumbed and capable of supporting a minimum 250 pounds [115

kg]. Failure to comply with these requirements could result in

personal injury, death or substantial property damage.

4.3 WALL MOUNTING GUIDELINES

The boiler is heavy and bulky. A minimum of 2 people is required for mounting the boiler.

DO NOT mount or attempt to mount the wall bracket to hollow sheet rock or lath walls

using anchors. Only install boiler to studs or equivalent wood structure.

The wall-mounting bracket is designed for stud spacing of 12 inch or 16 inch on center.

For unconventional stud spacing, a solid / secure mounting surface must be provided for

installation of the bracket.

For mounting on wood studs, install the bracket using the lag screws provided with the

boiler. Ensure both lag screws are installed securely in the studs.

For mounting on metal studs, install the bracket to the studs using 3/16” toggle bolts and

washers.

For mounting on solid walls (rock, concrete, brick, cinder block, etc.), install the wall bracket

using anchors (double expansion shields) and bolts with washers provided with the boiler.

Page 29 of 188

AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913

OMM-0089_0A

MC1 06/19/14

Ph.: 800-526-0288