GF-135 Esteem 399 Low NOx Boiler

Chapter 11

OMM-0089_0A

Installation, Operation & Maintenance Manual Start-Up Preparation

11.4 CHECK FOR GAS LEAKS

WARNING!

Prior to start-up and during initial operation, smell near the floor

and around the unit for gas odorant or any unusual odor. Do not

proceed with the start-up if there is any indication of a gas leak.

Any leaks found must be repaired immediately.

WARNING!

Propane installations only:

the propane supplier mixes an

odorant with the propane to make its presence detectable. In some

cases the odorant can fade and the gas may no longer have an

odor. Prior to start-up of the unit and periodically after start-up have

the propane supplier check and verify the odorant level.

11.5 CHECK THERMOSTAT CIRCUIT

Perform the following to check the thermostat circuit.

Checking the Thermostat Circuit

1. Disconnect the external thermostat wires from the low voltage terminal strip.
2. Connect a voltmeter across the wire ends of the external thermostat wiring.
3. Close each thermostat, zone valve and relay in the external circuit one zone at a time and

check the voltage reading across the wire ends.

4. There should NEVER be voltage measured at the wire ends.
5. If voltage is measured at the panel under any condition, check and correct the external

wiring.

NOTE

In systems using 3-wire zone valves, back-feed of voltage to the

unit is a common problem. Use an isolation relay to prevent

voltage from the external circuit entering the Esteem control panel.

6. Reconnect the external thermostat wires to the low voltage terminal strip.