3 boiler replacement, 4 recommended clearances – AERCO Esteem Boiler with EZ-Set Controller User Manual

Page 16

background image

GF-135

Esteem 399 Low NOx Boiler

Chapter 2

OMM-0089_0A

Installation, Operation & Maintenance Manual

Installation

The Esteem 399 Low NOx should be installed in a location so that any water leaking from the

boiler or piping connections or relief valve will not cause damage to the area surrounding the

unit or any lower floors in the structure.

2.3 BOILER REPLACEMENT

If the Esteem 399 is replacing an existing boiler, the following items should be checked and

corrected prior to installation:

Boiler piping leaks and corrosion.

Improper location and sizing of the expansion tank on the boiler heating loop.

If applicable, level and quality of freeze protection within the boiler system.

See the warning in section 17.22 Handling Previously Fired Combustion Chamber

Insulation.

2.4 RECOMMENDED CLEARANCES

The Esteem 399 Low NOx is approved for zero clearance to combustibles, excluding vent and

boiler piping.

Boiler Piping - 1/4 inch from combustible materials.

See Vent System Installation Supplement GF-125V for vent clearance requirements.

To provide service access to the unit it is recommended that the following clearances be
maintained:

Surface

Dimension

Top Jacket

24 inches [610 mm].

Front

24 inches [610 mm].

Rear

0 inches

Sides

6 inches [153 mm]

Bottom Piping

24 inches [610 mm].

WARNING!

If the clearances listed above cannot be maintained or the

enclosure in which the boiler is installed is less than 85 cubic feet,

the space must be ventilated. See chapter 3 for requirements.

NOTE

When maintaining zero clearance or less than recommended

clearances, some product labeling may become hidden and

unreadable.


Page 16 of 188