Great Plains YP625PD Predelivery Manual User Manual
Export pre-delivery instructions, Manufacturing, inc, And 9-row planters with air-pro® seed meters

Manufacturing, Inc.
© Copyright 2011
Printed 07/05/2011
401-754Q
YP625PD/TD/925TD
i
Export Pre-Delivery Instructions
YP625PD, YP625TD and YP925TD
6- and 9-Row Planters with Air-Pro® Seed Meters
Read this manual entirely. When you see this symbol, the subsequent
instructions and warnings are serious - follow without exception.
Your life and the lives of others depend on it!
Illustrations may show optional equipment not supplied with standard unit, or may show
pull-type, two-point or three-point models where differences are immaterial to the
immediate topic.
Null4:
Null4:
31794
FigureSpacer:
EN
                    This manual is related to the following products:                                    
                                                                Table of contents                                                                        
                Document Outline
- Export Pre-Delivery Instructions
 - Table of Contents
 - Important Safety Information
- Look for Safety Symbol
 - Be Aware of Signal Words
 - Prepare for Emergencies
 - Be Familiar with Safety Decals
 - Wear Protective Equipment
 - Use A Safety Chain
 - Avoid High Pressure Fluids
 - Tire Safety
 - Use Safety Lights and Devices
 - Keep Riders Off Machinery
 - Transport Machinery Safely
 - Shutdown and Storage
 - Practice Safe Maintenance
 - Safety At All Times
 
 - Introduction
 - Preparation
 - Rack Unloading
 - Planter Assembly
- Support the Main Frame
 - Install Parking Stands
 - Re-align Shifted Openers
 - Erect Manifold Supports
 - Install Drive Components
 - Adjust Gauge Wheel Arms
 - Install Gauge Wheels
 - Install Ground Drive Arm
 - Install Lift Assist Weldment
 - Setup Parallel Arms
 - Mount Openers
 - Install Drive Shaft
 - Install Lift-Assist
 - Install Tongue
 - Install Air System
 - Install Lights
 - Route Speed Sensor Cables
 - Install Seed Harness
 - Install Markers (Option)
 - Route Hydraulic Hoses
 - Install Fertilizer Hoppers (Option)
 - Install SMV
 - Install Spring Wrench
 - Install Timing Tool
 - Install Seed Hoppers
 - Install Row Cleaners (Option)
 - Install Coulters
 - Install Pressure Gauge
 - Connect Air Sensor Lines
 - Install Clean-Out Funnel
 - Store Lift Lock Channels
 - Install Press Wheels
 - Install Ground Drive Wheel
 
 - Closeout
 - Install Options
 - Appendix
- Torque Values Chart
 - Hydraulic Connectors and Torque
 - Tire Inflation Chart
 - Opener Stations: YP625PD18TP110
 - Harness: YP625PD18TP110
 - Final Decal Placement: YP625PD18TP110
 - Coulter Stations: YP625PD18TP110
 - Opener Stations: YP625TD12TR110
 - Harness: YP625TD12TR110
 - Final Decal Placement: YP625TD12TR110
 - Coulter Stations: YP625TD12TR110
 - Opener Stations: YP625TD18TP110
 - Harness: YP625TD18TP110
 - Final Decal Placement: YP625TD18TP110
 - Coulter Stations: YP625TD18TP110
 - Opener Stations: YP925TD0965
 - Harness: YP925TD0965
 - Final Decal Placement: YP925TD0965
 - Coulter Stations: YP625TD18TP110
 - Chain Setup
 - Parts List
 - Abbreviations
 
 - Index
 
