beautypg.com

Rockwell Automation GV3000/SE AC Drive AutoMax Network Communication Board, M/N 2AX3000 User Manual

Page 20

background image

Installation

2-11

Step 4.6 Fasten the left side of the AutoMax Network option board to the keypad

bracket using the two plastic rivets.

Step 4.7 Reconnect the keypad bracket to the keypad support bracket by inserting

the mounting tabs into the slots in the support bracket and tightening the
thumb screw.

Step 4.8 Align the Regulator board’s 26-conductor ribbon cable connector with the

Current Feedback board connector. Press it in until it locks into position.

Step 5.

Reinstall the Keypad Support Bracket in the Drive

Step 5.1 Route the Network Drop Cable through the left-most opening at the bottom

of the drive.

Step 5.2 Connect the brown wire to terminal 1 of the 2-connector terminal strip.

Connect the white wire to terminal 2.

Step 5.3 Reconnect any wiring that was removed from the Regulator board.

Step 5.4 NEMA 4X/12 drives only: Before installing the cover, check that the gaskets

on the cover are flat and within the gasket channels.

Step 5.5 Reinstall the cover. Align all cover screws into the heat sink before

tightening any of them.

To maintain the integrity of NEMA 4X/12 drives, sequentially tighten the
cover screws to ensure even compression of the gaskets. Do not exceed
2.2 Nm (20 in-lb) of torque on these screws.

This completes the hardware installation of the AutoMax Network option board. Do not
remove the lockout and tag until you have completed section 2.10, which provides
instruction on connecting to the AutoMax network.