Installation Prerequisites

61179641AL4-5B

3-3

INSTALLATION PREREQUISITES

The following items should be completed prior to installing the Total Access 1248:

1. Make sure that the network feed is in place.
2. Make sure that local power is available and that the required fuses are installed.

CAUTION

The maximum power draw for the Total Access 1248 system is 75
watts.

ADTRAN recommends an external fuse rated at 3.0 amps.

3. Complete

Table 3-2

with the information that is needed to turn-up and provision the Total

Access 1248.

Table 3-2. Turn-up and Provisioning Prerequisite information

Item Description

Value

Network Feed/Aggregation System IP Address

Network Feed/Aggregation System Port

Total Access 1248 IP Address

Total Access 1248 Default Gateway

Total Access 1248 Subnet Mask

Total Access 1248 VPI/VCI

Number of Network Facilities Feeding the Total Access 1248

CLEI Code/System Name