4. Commissioning

4−6

Festo P.BE−SPC200−SMX−1−EN en 0503b

Electric linear axis

Proceed as described in the operating instructions for the
electric linear axis.

Check especially the position and functioning of the limit
switches.

Carry out the first tests as follows:

ć

with the compressed air switched off (providing pneuĆ
matic axes are connected to the SPC200)

ć

without work load

ć

with disconnected coupling.

If the motor continues to run when the power supply for the
stepping motor controller is switched on, switch off the power
supply immediately and check the signal connections as well
as the earth and power cables.

System inputs for commissioning

With some commissioning steps, e.g. the signals ENABLE,
START and STOP are required for controlling the axes. For
commissioning stepping motor axes e.g. with the steps:

ć

Move to reference point

ć

In some cases emergency movement (diagnosis and fault
treatment)

ć

Test and start program

Instructions on providing the signals can also be found in the
SPC200 or WinPISA manuals, in some cases also in the manĆ
ual for the field bus module.