1 general instructions, General instructions – Festo Кабели и принадлежности User Manual
Page 38
3. Installation
3−3
Festo P.BE−SPC200−SMX−1−EN en 0503b
3.1
General instructions
Warning
Before carrying out installation and/or maintenance work,
switch off the following in the sequence specified:
1. the compressed air supply
2. all load and operating voltage supplies on the SPC200
and the connected components of the positioning
system.
Load and operating voltage supplies:
ć
The load voltage supply for field devices and proportional
directional control valves (plug X2, pin 1)
ć
The load voltage supply for the outputs (plug X6/X8,
pinĂ8)
ć
If applicable, the load voltage supply on the axis interface
string
ć
The operating voltage supply for the internal electronics
of the SPC200 and field devices (plug X2, pin 2)
ć
The sensor supply on the stepping motor indexer module
(connection SIGNALS, pin 4)
ć
The operating voltage supply on the stepping motor conĆ
troller
You can thereby avoid:
ć
undesired movements of the connected actuators
ć
uncontrolled movements of loose tubing
ć
undefined switching states
ć
damage to the electronic components.