Festo Кабели и принадлежности User Manual
Page 29
2. Fitting
2−3
Festo P.BE−SPC200−SMX−1−EN en 0503b
Warning
Before carrying out installation and/or maintenance work,
switch off the following in the sequence specified:
1. the compressed air supply
2. all load and operating voltage supplies on the SPC200
and the connected components of the positioning
system.
You can thereby avoid:
ć
unexpected movements of the connected actuators
ć
uncontrolled movements of loose tubing
ć
undefined switching states.