beautypg.com

HP Hitachi Dynamic Link Manager Software User Manual

Page 51

background image

HiCommand

®

Dynamic Link Manager (HDLM) for Windows

®

Systems User’s Guide

35

Note: If there is a path failure immediately after a path is made offline by using an HDLM
command or HDLM GUI, Offline(C) might change to Offline(E). If an offline operation was
performed, wait for a fixed period of time (about 2 minutes), check the path status by using
an HDLM command or HDLM GUI, and make sure that the status has changed to Offline(C). If
it is Offline(E), retry the offline operation.