beautypg.com

Start-up, 1 starting the signal converter – KROHNE ALTOSONIC V12 EN User Manual

Page 31

background image

START-UP

5

31

ALTOSONIC V12

www.krohne.com

04/2013 - 4002643502 - MA ALTOSONIC V12 R02 en

5.1 Starting the signal converter

The measuring device, consisting of the measuring sensor and the signal converter, is supplied
ready for operation. All operating data have been set at the factory in accordance with your order
specifications.

When the power is switched on, a self test is carried out (KROHNE logo is visible during the test).
After that the device immediately begins measuring, and the current values are displayed.

It is possible to change between the two measured value windows, the trend display and the list
with the status messages by pressing the keys ↑ and ↓.

CAUTION!
The used power supply must be able to supply at least 3 A during the start-up of the converter.

Figure 5-1: Displays in measuring mode (examples for 2 or 3 measured values)
x, y and z denote the units of the measured values displayed