Honeywell MK VI User Manual
Page 32
Honeywell
MK VI MK VIII EGPWS Installation Design Guide
Proprietary notice on title page applies
CAGE CODE: 97896
SCALE: NONE
SIZE: A
DWG NO: 060-4314-150
REV:
SHEET
32
D. Position Slide Lock and Spring Clip onto connector.
E. Install Backshell Housing onto connector. The Ground wire (used for ESD discharge) is terminated with
shielded pigtails inside the backshell to the P2 connector.
F. Organize and dress wire exiting from the backshell, route Configuration Module wires in a coil. Install Cable
Clamp, do not tighten Cable Clamp screws.
G. Secure the Configuration Module to the connector using screws provided. Tighten Cable Clamp screws as
required.
CONFIGURATION MODULE ASSEMBLY
REQUIRED:
Two items as follows:
1.0
Connector (P2)
Positronic Ind. RD50F10JVLC-15 *
2.0
Configuration Module
Honeywell
700-1710-020
* This item may be available from Honeywell under Part No. (440-1233-001)
ITEM 2 DESCRIPTION:
Connector P2 (Positronic Ind. PN RD50F10JVLC-15) is a packaged kit consisting of the following parts:
1.1
Connector, 50 socket D-Sub
Qty - 1
1.2
Contacts, size 20 crimp
Qty - 50
1.3
Backshell housing
Qty - 1
1.4
Backshell plate
Qty - 1
1.5
Screws, Phillips CSK
Qty - 2
1.6
Spring Clip
Qty - 1
1.7
Slide Lock
Qty - 1
1.8
Screws, Slotted
Qty - 2
1.9
Cable Clamp
Qty - 1