10 contour train (cycle 25, din/iso: g125), Cycle run, Seite 204 – HEIDENHAIN iTNC 530 (60642x-04) Cycle programming User Manual
Page 204

204
Fixed Cycles: Contour Pocket, Contour Trains
7.
1
0
CONT
OUR TRAIN (Cy
c
le 25, DIN/ISO:
G125)
7.10 CONTOUR TRAIN (Cycle 25,
DIN/ISO: G125)
Cycle run
In conjunction with Cycle 14 CONTOUR GEOMETRY, this cycle facilitates
the machining of open and closed contours.
Cycle 25 CONTOUR TRAIN offers considerable advantages over
machining a contour using positioning blocks:
The TNC monitors the operation to prevent undercuts and surface
blemishes. It is recommended that you run a graphic simulation of
the contour before execution.
If the radius of the selected tool is too large, the inside corners of
the contour can be reworked using the feature for automatic
identification of residual material.
The contour can be machined throughout by up-cut or by climb
milling. The type of milling even remains effective when contours
are mirrored in one axis.
The tool can traverse back and forth for milling in several infeeds
(reciprocating plunge-cut): This results in faster machining.
Allowance values can be entered in order to perform repeated
rough-milling and finish-milling operations.
Cycle 270 CONTOUR TRAIN DATA provides an easy way to define
the behavior of Cycle 25.
Y
X
Z