beautypg.com

3 t ransf er – HEIDENHAIN SW 68894x-02 User Manual

Page 559

background image

HEIDENHAIN CNC PILOT 640

559

8.3 T

ransf

er

Selecting the program
In the window on the left, the CNC PILOT shows a file list of the

control. The files of the remote station are displayed in the window on

the right when a connection is established. With the cursor keys you

can switch back and forth between the two windows.
When selecting a program, place the cursor on the desired program

and press the Mark soft key. You can also select all programs with Mark
everything.

Marked programs are highlighted in color. To unmark a program,

simply press Mark once again.
The CNC PILOT displays the file size and the time of the last

modification of the program in the list if permitted by the length of the

file name.
With DIN programs/subprograms, you can also view the NC program

with the Program view soft key.
Press the Transmit or Receive soft key to start transferring the files.
During transfer, the CNC PILOT displays the following information in a

transfer window

(see illustration):

The name of the program which is currently being transferred.

If a file already exists in the target path, the CNC PILOT asks

whether you want to overwrite the file. You can then activate

overwriting for only that file or for all files in the transfer.

If the CNC PILOT detects during transfer that the transferred files are

linked to other files (subprograms, ICP contours), a dialog box opens

where you can select the linked files for transfer.

Transferring project files
If you wish to transfer files from a project, the "Project" soft key

enables you to open the project management of the control and select

the corresponding project (see "Project management" on page 118).

Soft keys for program selection

Marks all files in the current window.

Marks or unmarks the file at the

cursor position and moves the cursor

down one position.

Opens a DIN main program or

subprogram for reading.

The Internal project soft key enables you to manage

projects and transfer complete project folders (see also

"Project management" on page 118).