beautypg.com

Getting started, Applying power, Boot-up sequence – Grass Valley Imagestore 750 v.2.0.1 User Manual

Page 41

background image

Imagestore 750 User Manual

Overview

Miranda Technologies Inc.

Page 41

Getting Started

Applying Power

Before applying power, ensure that the USB port does not contain a USB
stick. Each of the two power supply units (PSU) on the Imagestore 750
contains a power switch accessible by removing the front facia. The product
should be connected to the mains via an appropriate circuit breaker on each
circuit.

Boot-Up Sequence

Once power is applied, Imagestore 750 will boot automatically and the
normal complete boot process takes about 50 seconds (approx 90 seconds
after a software upgrade).

Before booting normally, the unit first checks to see if there is a USB stick in
the USB port and, if it finds one, it will attempt to boot from that disk.
Miranda Technologies Inc. issues specialised USB sticks for use as part of
the software upgrade boot-up sequence. No other USB stick should ever be
inserted. The upgrade procedure is covered later in this manual.

The normal boot sequence is complete when the following top level "boot-
up" menu appears on the front panel display.

Note:

When a restart is required to change settings such as the video
standard, then a Software Reset can be used. Since this option
will usually complete in approximately 16 seconds it is much
faster than Restart System.