Controller modules, Swapping a mcs-mc-c2 with a mcs-mc-c2 – Grass Valley Concerto Routing Matrix v.1.8.1 User Manual
Page 147

Concerto — Installation and Service Manual
147
Field Replaceable Units
Figure 82. Fan Replacement (7 RU frame shown)
Controller Modules
Swapping a MCS-MC-C2 with a MCS-MC-C2
The following procedures are used to swap a MCS-MC-C2 with a replace-
ment.
Encore Controlled Non-Redundant Systems
1.
Inspect the new Controller module.
2.
Set the DIP Switch bank S11 switch number 1 to
ON
. Switches 2 to 8 are
set to
OFF
.
3.
Remove the old Controller module.
4.
Insert and seat the new Controller module.
The
PWR OK
(power OK) and
DONE
LED will light signifying the module
is up and ready to receive commands. The next command sent from the
control system will cause the
ACT
(active) LED to turn on.
The next command sent from the control system will cause the
ACT
LED
to turn on. Continued commands prompt the
ACT
LED to flash.
5.
Send a switch command from the control system and verify that the
switch was executed.
8138_00_09r0
Fan Module
Finger hole