Is-is address format, Bfd for is-is configuration example – H3C Technologies H3C S12500-X Series Switches User Manual
Page 182
168
Restart phase: Finish
Restart t1: 3, count 10; Restart t2: 60; Restart t3: 300
SA Bit: supported
Level-1 restart information
---------------------------
Total number of interfaces: 1
Number of waiting LSPs: 0
Level-2 restart information
---------------------------
Total number of interfaces: 1
Number of waiting LSPs: 0
296B
BFD for IS-IS configuration example
569B
Network requirements
•
As shown in
1050H
Figure 44
, run IS-IS on Switch A, Switch B and Switch C so that can reach each other
at the network layer.
•
After the link over which Switch A and Switch B communicate through the Layer-2 switch fails, BFD
can quickly detect the failure and notify IS-IS of the failure. Switch A and Switch B then communicate
through Switch C.
Figure 44 Network diagram
Device
Interface
IP address
Device
Interface
IP address
Switch A
Vlan-int10
10.1.0.102/24
Switch B
Vlan-int10 10.1.0.100/24
Vlan-int11
11.1.1.1/24
Vlan-int13 13.1.1.1/24
Switch
C
Vlan-int11
11.1.1.2/24
Vlan-int13
13.1.1.2/24
570B
Configuration procedure
1.
Configure IP addresses for interfaces. (Details not shown.)
2.
Configure basic IS-IS:
# Configure Switch A.
[SwitchA] isis